NEW BUILD 022

for

Mark Anderson and partners.

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7
Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14
Week 15 Week 16 Week 17 Week 18 Week 19 Week 20 Week 21
Week 22 Week 23 Week 24 Week 25 Week 26 Week 27 Week 28
Week 29 Week 30 Week 31 Week 32 Launch Week 34 Week 35
Week 36            
Steel and aluminium arrives for new contract.

Description of Boat

Steel hulled motor fishing vessel as laid out in General Arrangement Drawing number 53305/1 Revision A, having double chine hull, sloped transom stern, semi bulbous bow, soft nose stem and with full length shelter deck. Arranged for single and twin rig trawling.

Below deck to be subdivided by three watertight bulkheads into: aft accommodation with steering gear, engine room, fishroom and forepeak tank/store.
The main deck is to have an athwartships, steel casing centred aft of midships for galley, mess and washroom. Aft side to have a steel shelter and integral gallow arrangement over net drum space, continued to transom. Forward, to have a non-weathertight aluminium alloy fish handling shelter space with winch and watertight focsle store.
Shelter deck to have aluminium alloy wheelhouse, foremast and landing derrick, trawl gallows and crane with power block.
Main Dimensions 

 

Length Overall          
18.77 metres 61' 6"
Length Register  16.49 metres 54' 0"
Breadth moulded  7.00 metres 22' 11"
Depth moulded  4.15 metres 13' 7"
Draught aft (design) 4.15 metres 13' 7"
Fuel capacity (approx) 18000 litres 4000 gal.
Fresh water capacity  4000 litres 880 gal.
Ice Locker capacity 10 tonnes

 

 

[Home]    [New Builds]    [History]    [Gallery]    [Directors]    [Repairs]    [Services]

Last updated 11/05/08.
Company Number 4005938, Reg Office 12-13 Alma Square, Scarborough.
Photos by kind permission of Sid Weatherill (c)
Web page designed by Komtutor (c)
AddFreeStats