Jim & John


John working on Sunbeam

New pictures added

06/11/09

Water blasting Sparkling Lines hull ready for painting  

New pictures added

22/08/09

 

 Emulate II in dry dock for service and repaint      

New pictures added

15/08/09

VAGSKAR in dry dock for repairs to stem and planks Shaping planksFitting plank to starboard bow Port side completed
Photo by David Linkie

New pictures added

21/02/09

Sandy West signing new contract on behalf of Virtuous LLP with Parkol directors and staff    
New pictures added

27/01/08

Whitby dreger Sandsend in dry dock for service and repaint  New pictures added

27/01/08

New wheel house under construction for Aspier  
  
New pictures added

27/01/08

 

Auxilary hydraulic engine being fitted into Rachael JayneHydraulic engine now installedNew pictures added

23/09/07

 

Two masted yacht MAYB in dry dock for inspection and maintenance
New pictures added

28/07/07

STAR OF JURA in dock for repaint and maintenanceNew pictures added

26/05/07

Rois Mhairi back to Parkol for Repainting
New pictures added

26/05/07

Kristanjo in dry dock for new 406 Caterpillar engine and repaint also Fioelitas in for DTI service and paintNew pictures added

04/03/07

Stripping down Kelvin engine out of
Nicholas M, to be replaced with 3406 Cat
New pictures added

25/02/07

New pictures added

01/10/06

Aquarius & Grena Star on
dry dock for maintenance
Whitby dredger Sandsend in dry dock Spud leg housing now complete
New pictures added

24/09/06

Whitby dredger Sandsend in dry dock for new spud legsBefore renovationFabricating spud legsSpud legs being fittedNew spud leg housing fitted ready for final welding
New pictures added

03/09/06

New pictures added

31/07/06

Sleipner in dry dock for overall and repaintFisheries patrol vessel in dry dock for painting
New pictures added

09/07/06

New pictures added

17/4/06 

Repair to main mast of yacht Valiant
Kristanjo in for three barrel trawl winch refurbishRois Mhairi in for repaintSplicing in new bottom section
New pictures added

17/4/06

New pictures added 16/10/05
Good Intent in dry dock for repairsFitting new hull platesFisheries protection vessel in dry dock for annual maintenance & repaint
New pictures added
16/10/04
(Dry dock) Scarborough borough council's Split  dump barge in dry dock for annual check over.jpg (19943 bytes)New pictures added 11/11/04 Dry dock John & Andrew fitting new prop shaft to Genesis.jpg (22130 bytes)
Scarborough borough council's Split dump barge in dry dock for annual check overJohn & Andrew fitting new prop shaft to Genesis
New pictures added
08/09/04

Nicholas M

Nicholas M in for new stern tube and shaft.jpg (14425 bytes)New pictures added
25/8/04

Our Lass

Our Lass having work carried out for DTI inspection

Our Lass in dry dock. Work carried out for DTI inspection.jpg (18173 bytes)New pictures added 3/6/04

Norwood

Norwood of Hartlepool having new gallows fitted.jpg (20577 bytes)
Nicholas M in for new stern tube and shaftNorwood of Hartlepool having new gallows fitted
New pictures added 3/6/04

Grenaa Star

Grenaa Star in dry dock for prop repair and maintenance .jpg (21835 bytes)New pictures added 24/5/04

Reliant 
Buckie

1 (for dry dock) Built by Parkol three years ago Reliant Buckie comes back for painting and maintenance.jpg (25561 bytes)
Grenaa Star in dry dock for prop repair and maintenanceBuilt by Parkol three years ago, Reliant, Buckie comes back for painting and maintenance
New pictures added 26/03/04

Shepherd Lad in dry dock

L. Shepherd Lad in dry dock for new rudder.jpg (13553 bytes)K. Dry dock  Jim cutting out new rudder for Shepherd Lad.jpg (16394 bytes)New pictures added 04/05/04

Venus 
in dry dock 

 

1 Whitby trawler Venus in dry dock for repairs to hull.jpg (18860 bytes)2..jpg (17277 bytes)
Shepherd Lad in dry dock for new rudderJim cutting out new rudder for Shepherd LadWhitby trawler Venus in dry dock for repairs to hull
New pictures added 22/03/04 I. The 87ft Maggie M in dry dock for refurbishment and DTI inspection.jpg (17732 bytes)J. Maggie M.jpg (12828 bytes)K. Maggie M.jpg (17650 bytes)X. New engine for Challenger.jpg (16528 bytes)
The 87ft Maggie M in dry dock for refurbishment and DTI inspectionNew engine for Challenger
New pictures added 18/9/03

 New engine into Aquarius

A. Andrew guides new engin into Aquarius.jpg (12569 bytes)B.jpg (9809 bytes)C. Aquarius engin installed.jpg (14405 bytes)D.Engine cooling system for Aquarius.jpg (14577 bytes)
Andrew guides new engine in Engine installed. Engine cooling system 
New pictures added 11/9/03

Sandsend Conversion 

 

The Sandsend to be before Parkol's conversion.jpg .jpg (16354 bytes)4 John & Andrew demonstrate split hopper mechanism.jpg (19495 bytes)Mayor & council officials get conducted tour.jpg (15587 bytes)Mayor ready to christen the new Sandsend.jpg (16553 bytes)Champagne breaks across her bow.jpg (15564 bytes)
Sandsend before conversiondemonstrate split hopper mechanismMayor & council officials get conducted tour. Mayor ready to christen  Champagne breaks across her bow
New pictures added 17/7/03Construction of wheel house for barge 1.jpg (15548 bytes)Construction of wheel house for barge 2.jpg (14659 bytes)Propulsion units for barge refit.jpg (15850 bytes)Propulsion units.jpg (15573 bytes)Propulsion for barge being fitted.jpg (17181 bytes)
Construction of wheel house for bargePropulsion units for barge refit. Propulsion for barge being fitted.
New pictures added 23/5/03

Defiant

A Defiant comes back to Whitby.jpg (17311 bytes)B Defiant gets reconditioned.jpg (13826 bytes)C Pot hauling forward winch.jpg (17121 bytes)D Starboard side entry under shelter deck for pots.jpg (14409 bytes)E Pot entry to shelter deck.jpg (17408 bytes)
Defiant comes back to WhitbyDefiant gets reconditionedPot hauling forward winch Starboard side entry under shelter deck for pots Pot entry to shelter deck.
New pictures added 06/03/03

GALWAD-Y-MOR

A Dismantling podium from GALWAD-Y-MOR.jpg (16700 bytes)B Dismantling podium from GALWAD-Y-MOR.jpg (18487 bytes)Cat catcher being fabricted for GALWAD-Y-MOR.jpg (15564 bytes)E Fabrication of podium for GALWAD-Y-MOR.jpg (15101 bytes)
Dismantling podiumCat catcher being fabricted Fabrication of podium
New pictures added 25/02/03Refurbished trawl winch fitted into Jacinth.jpg (16531 bytes)Refurbished trawl winch fitted into Jacinth   
New pictures added 29/01/03TWO BOYS of Fleetwood in for new shelter deck.jpg (15905 bytes)TWO BOYS before work on new shelter deck .jpg (18937 bytes)Two Boys with new shelter deck .jpg (13280 bytes)Valkyrie alias Two Boys having last minute touches w2.jpg (14589 bytes)Valkyrie alias Two Boys preparing to sail W.jpg (17174 bytes)
Two Boys of Fleetwood in for new shelter deckTwo Boys with new shelter deck Two Boys of Fleetwood ready to sail with new shelter deck
New pictures added 22/01/03Navantae's damaged engin casing.jpg (18817 bytes)John installing new engin into Navantae .jpg (16616 bytes)New engin installed into Novantae .jpg (16361 bytes)Malita on slip to fit nozzle.jpg (13841 bytes)New nozzle fitted on Malita .jpg (15363 bytes)
Navantae's damaged 
engine casing.
John installing new engine into NavantaeNew engine installed into NovantaeMalita on slip to fit nozzle.New nozzle fitted on Malita
decomishoning.jpg (26395 bytes)partners2.jpg (51581 bytes)drydock-reliant.jpg (26671 bytes)hatherleigh-reliant.jpg (73651 bytes)john-andrew.jpg (66012 bytes)jackalineAnn.jpg (57069 bytes)
 Jim & John decommissioning Wakeful Jim, John & sons on the new boat for
Locker Trawlers
 Regal Lady on Dry Dock & Reliant ready for launch Hathliegh on Dry Dock & Our Lass being builtJohn & son working on new engine for
Our Pride
Jacqueline Anne on Launch day
reginaCaelis2.jpg (35333 bytes)

 

reginaCaelis.jpg (49361 bytes)drydock.jpg (46678 bytes)drydock-kristianjo.jpg (56172 bytes)hatherleigh.jpg (77648 bytes)

 sunbeam-drydock.jpg (41781 bytes)

 

Reginna Calus on Dry DockRejoice on
Dry Dock
 Kristanjo on Dry Dock

Hatherliegh on
Dry Dock

brainhartly-gemmafedlis.jpg (65467 bytes)samanthaLBefore.jpg (39748 bytes)samanthaLAfter.jpg (74582 bytes)dock_shed.jpg (29799 bytes)
Reginna Calus on Dry Dock Gemma Fedelis & Brian Hartly on Dry Dock togetherSamatha L
before refit

Samatha L
after refit

Carol H on Dry Dock

Sunbeam on Dry Dock

[Home]    [New Builds]    [History]    [Gallery]    [Directors]    [Repairs]    [Services]

Last updated 06/11/09.
Company Number 4005938, Reg Office 12-13 Alma Square, Scarborough.
Photos by kind permission of Sid Weatherill (c)
Web page designed by Komtutor (c)
AddFreeStats